Jeronimo de Albuquerque, the Brazilian Navy’s second Tamandaré-class stealth frigate, has returned to sea for a second series of acceptance trials.
The warship, which has been built at TKMS Estaleiro Brasil Sul in Itajaí, Santa Catarina, in southern Brazil, is a 107-metre multipurpose frigate based on TKMS’s MEKO A-100 platform, and displaces about 3,500 tons.
The new sea trials are focusing on combat systems: the warship armaments include a 12-cell vertical launch systems (VLS) for SeaCeptor surface-to-air missiles, as well as eight Mansup anti-ship missiles and Mk54 torpedoes.
As per a TKMS press statement: “This phase involves testing and validating critical systems that are essential to the frigate’s operational capability and combat capabilities. This represents another important step on the way to delivery to the Brazilian Navy.”
The Brazilian Navy took delivery of the first-in-class ship Tamandaré in April. Jerônimo de Albuquerque was launched in August last year; she is expected to conduct a weapons demonstration during in the first half of 2027.
Third-in-class frigate Cunha Moreira was launched in June this year and is expected to be delivered in 2028, with the final ship following suit in 2029. The keel was laid on ship four, the future Mariz e Barros, towards the end of August this year.
Brazil has also signalled its intention to acquire four more Tamandaré-class frigates; at the commissioning ceremony for the Tamandaré, a Memorandum of Understanding (MoU) was signed paving the way for four more ships between the German shipbuilder, the Ministry of Defense of Brazil and Embraer.
TKMS added: “As the main industrial partner of the program, TKMS remains committed to the successful implementation of the Tamandaré frigate programme, in close cooperation with the customers EMGEPRON, the Brazilian Navy and other partners.”
- You can read more details about the expanded Tamandaré-class programme on the TKMS website














